NASA-LLIS-1796

Lessons Learned - MRO Waveguide Transfer Switch Anomaly

active, Most Current
Organization: NASA
Publication Date: 15 May 2007
Status: active
Page Count: 6
scope:

Abstract:

A waveguide transfer switch failed five months after the insertion of Mars Reconnaissance Orbiter into Mars orbit. The likely cause was debris-induced RF breakdown that pyrolized a polyimide tape window in the switch, injecting additional debris that jammed the switch. Thirteen measures are recommended in the areas of waveguide fabrication, RF system/ materials design, mission design, and exemptions to the JPL single-point failure policy.

Document History

NASA-LLIS-1796
May 15, 2007
Lessons Learned - MRO Waveguide Transfer Switch Anomaly
Abstract: A waveguide transfer switch failed five months after the insertion of Mars Reconnaissance Orbiter into Mars orbit. The likely cause was debris-induced RF breakdown that pyrolized a...