NASA-LLIS-0096

Lessons Learned - Lift Operations Utilizing a Hydraset or Dynamometer

active, Most Current
Organization: NASA
Publication Date: 3 August 1992
Status: active
Page Count: 2
scope:

Description of Driving Event:

Replacement of the upper floating beam forward roller support shaft was in progress to eliminate a stress corrosion concern. The 5-ton bridge crane and a sling were being used to lift the Pad B PGHM side 2 upper floating beam Z bar off of the Z roller when a small block with two 5/8" bolts apparently sheared, allowing Z Bar to travel up, contacting a portion of the upper floating beam causing the web strap to be cut.

Document History

NASA-LLIS-0096
August 3, 1992
Lessons Learned - Lift Operations Utilizing a Hydraset or Dynamometer
Description of Driving Event: Replacement of the upper floating beam forward roller support shaft was in progress to eliminate a stress corrosion concern. The 5-ton bridge crane and a sling were...