UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NASA-LLIS-0141

Lessons Learned - Radioisotope Thermoelectric Generator Facility (RTGF) Lifting Operations

active, Most Current
Organization: NASA
Publication Date: 5 October 1992
Status: active
Page Count: 2
scope:

Description of Driving Event:

The 10-ton crane at the RTGF is used to lift and position radioisotope thermoelectric generators and ground support equipment. Crane electrical component failure increases the risk of load and/or crane damage. Failure of switches 3 or 4 results in bridge movement and bridge brake will not engage if a BR-1 relay failure occurs. Failure of switches 5 or 6 results in trolley movement and trolley brake will not engage if a BR-2 relay failure occurs. Failure of switches 7 or 8 results in hoist movement and hoist brake will not engage if a BR-3 OR BR-4 relay failure occurs. Failure of switch SW-2 in the fast speed position will result in the hoist operating in the fast speed even if the operator selects slow speed.

 

Document History

NASA-LLIS-0141
October 5, 1992
Lessons Learned - Radioisotope Thermoelectric Generator Facility (RTGF) Lifting Operations
Description of Driving Event: The 10-ton crane at the RTGF is used to lift and position radioisotope thermoelectric generators and ground support equipment. Crane electrical component failure...
Advertisement