UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NASA-LLIS-1835

Lessons Learned - Capture of Apollo Lunar Module Reliability Lessons Learned: Reliability Engineering

active, Most Current
Organization: NASA
Publication Date: 23 October 2007
Status: active
Page Count: 7
scope:

Abstract:

A July 2007 workshop attended by the former Grumman Corporation's Apollo Lunar Module Reliability and Maintainability (R&M) Team and Constellation Program personnel traced the success of the Apollo Lunar Module (LM) to reliability features that were locked into an early stage of LM design. The LM prime contractor (Grumman Corporation) and NASA shared responsibility for system reliability, provided for early Reliability Engineering involvement in evaluating design alternatives at the cross-Apollo system level, placed great emphasis on identification and elimination of critical single point failures, provided for extensive design redundancy, conducted parallel development of alternative technologies, tested critical hardware beyond qualification levels to the point of failure, and performed rigorous root cause analysis of failures. The Grumman retirees also recommended active management of design margins, providing the lunar lander with generous instrumentation and telemetry capabilities, and furnishing a strong Lander advocate during CEV design.

Document History

NASA-LLIS-1835
October 23, 2007
Lessons Learned - Capture of Apollo Lunar Module Reliability Lessons Learned: Reliability Engineering
Abstract: A July 2007 workshop attended by the former Grumman Corporation's Apollo Lunar Module Reliability and Maintainability (R&M) Team and Constellation Program personnel traced the success of...