NASA-LLIS-1520
Lessons Learned - Check Testbed Health Before Beginning or Resuming Flight System Test (2003)
| Organization: | NASA |
| Publication Date: | 28 January 2005 |
| Status: | active |
| Page Count: | 3 |
scope:
Abstract:
In a scenario that is most likely to occur on severely time-constrained flight projects, system-level testing is interrupted and test time is lost because of unreported changes to the testbed configuration. Use walkthroughs, briefings, startup procedures, and reporting tools to ensure at the beginning of each work shift that test operators are apprised of all changes to the system testbed configuration.
Document History