NASA-LLIS-1323

Lessons Learned – Interface Control Document (ICD) Violations by Payload Developer

active, Most Current
Organization: NASA
Publication Date: 11 October 2002
Status: active
Page Count: 2
scope:

Description of Driving Event:

The KSC provided Rack Insertion Device (RID) weight and CG end effector interferred with the MicroGravity Science Glovebox (MSG) payload rack umbilical launch restraint. Due to the interference, the MSG rack could not be installed onto the end effector and therefore delayed installation into the Multi-Purpose Logistics Module (MPLM), until the interference could be resolved.

Document History

NASA-LLIS-1323
October 11, 2002
Lessons Learned – Interface Control Document (ICD) Violations by Payload Developer
Description of Driving Event: The KSC provided Rack Insertion Device (RID) weight and CG end effector interferred with the MicroGravity Science Glovebox (MSG) payload rack umbilical launch...