NASA-LLIS-1529

Lessons Learned - Ensure Test Monitoring Software Imposes Limits to Prevent Overtest (2003)

active, Most Current
Organization: NASA
Publication Date: 11 October 2004
Status: active
Page Count: 3
scope:

Abstract:

When a GSE power meter registered zero due to an AC power glitch, the test monitoring and control software interpreted this as a loss of power and increased the test level past the maximum rating of the test article. This ground test error could have damaged flight hardware. Perform FMEA on test equipment to identify all potential GSE-induced failure modes. Either program the test control software or insert a limiting hardware device to prevent overtest.

Document History

NASA-LLIS-1529
October 11, 2004
Lessons Learned - Ensure Test Monitoring Software Imposes Limits to Prevent Overtest (2003)
Abstract: When a GSE power meter registered zero due to an AC power glitch, the test monitoring and control software interpreted this as a loss of power and increased the test level past the maximum...