NASA-LLIS-1230
Lessons Learned - Welds Near Tube Bends
| Organization: | NASA |
| Publication Date: | 21 January 1999 |
| Status: | active |
| Page Count: | 2 |
scope:
Description of Driving Event:
During dimensional inspection of orbital tube welds involving 316L tubing, it was found that 8 of 8 welds failed because of weld mismatch. The weld joints were located between two bends that formed a "S" bend. There was approximately 1 inch of straight tubing from each bend to the joint of the weld. The mismatch in this case is not to exceed 25% or 0.010 inch which ever is less.
Root cause: Tube bending / shaping typically causes the tube to take an oval shape, creating matching problems during weld fitting. Engineering drawings provided insufficient length for oval / runout to occur of the shaped / bent tube prior to welding of the joint.
Document History