Lessons Learned – Lock out/Tag out Procedure Not Followed

active, Most Current
Organization: NASA
Publication Date: 8 September 2003
Status: active
Page Count: 3
scope:

Abstract:

A mechanical technician came into contact with an energized electrical circuit at the LC-39, Pad A Oxidizer Storage Area. A control cabinet had been removed and the circuit breaker feeding the bare conductors had been locked out in the electrical switchboard. Another contractor was modifying the electrical distribution system. The LOTO device was improperly removed and the circuit was later re-energized.

Document History

NASA-LLIS-1365
September 8, 2003
Lessons Learned – Lock out/Tag out Procedure Not Followed
Abstract: A mechanical technician came into contact with an energized electrical circuit at the LC-39, Pad A Oxidizer Storage Area. A control cabinet had been removed and the circuit breaker feeding...
Advertisement