ASME/BPVC - SEC XII

SECTION XII RULES FOR CONSTRUCTION AND CONTINUED SERVICE OF TRANSPORT TANKS

inactive
Organization: ASME/BPVC
Publication Date: 1 July 2010
Status: inactive
Page Count: 340
scope:

Geometric Scope of the Pressure Vessel

(a) The geometric scope of this Section shall, as a minimum, include the pressure-containing parts of pressure vessels up to and including the following:

(1) the first threaded joint for threaded connections.

(2) the face of the first flange for flanged connections.

(3) the first sealing surface for proprietary connections or fittings for which rules are not provided for in this Section.

(4) the welding end connection for the first circumferential joint forwelded connections to attached piping, valves, and instruments, etc.

(5) the welding pad for attachment of any external nonpressure attachments such as shipping frames, and handling points, etc. Parts welded to these pads need not comply with TG-110.1(b).

(6) pressure-retaining permanent covers and closures, including seals, bolting, and other mechanical retainers at openings.

(b) Where nonpressure parts are directly welded to the pressure-retaining surface of a pressure vessel, this scope shall include the material, design, fabrication, and testing requirements established for nonpressure attachments by the applicable paragraphs of this Section.

(c) Items in addition to the pressure vessel transform the vessel into a tank. These items are addressed in the applicable Modal Appendix.

Physical Scope of the Pressure Vessel

(a) Internal pressure shall be in the range from 0 to 207 bar (full vacuum to 3,000 psig).

(b) The temperature range shall be from −269°C to 343°C (−452°F to 650°F).

(c) Thickness of shells and heads shall not exceed 38 mm (1½ in.).

Document History

July 1, 2023
SECTION XII RULES FOR CONSTRUCTION AND CONTINUED SERVICE OF TRANSPORT TANKS
This Section covers requirements for construction and continued service of pressure vessels for the transportation of dangerous goods via highway, rail, air or water at pressures from full vacuum to...
July 1, 2021
SECTION XII RULES FOR CONSTRUCTION AND CONTINUED SERVICE OF TRANSPORT TANKS
A description is not available for this item.
July 1, 2019
SECTION XII RULES FOR CONSTRUCTION AND CONTINUED SERVICE OF TRANSPORT TANKS
A description is not available for this item.
July 1, 2017
SECTION XII RULES FOR CONSTRUCTION AND CONTINUED SERVICE OF TRANSPORT TANKS
A description is not available for this item.
July 1, 2015
SECTION XII RULES FOR CONSTRUCTION AND CONTINUED SERVICE OF TRANSPORT TANKS
INTRODUCTION (a) The following information provides guidance to Code users for submitting technical inquiries to the committees. See Guideline on the Approval of New Materials Under the ASME Boiler...
July 1, 2013
SECTION XII RULES FOR CONSTRUCTION AND CONTINUED SERVICE OF TRANSPORT TANKS
Geometric Scope of the Pressure Vessel (a) The geometric scope of this Section shall, as a minimum, include the pressure-containing parts of pressure vessels up to and including the following: (1)...
July 1, 2011
SECTION XII RULES FOR CONSTRUCTION AND CONTINUED SERVICE OF TRANSPORT TANKS
Geometric Scope of the Pressure Vessel (a) The geometric scope of this Section shall, as a minimum, include the pressure-containing parts of pressure vessels up to and including the following: (1)...
SEC XII
July 1, 2010
SECTION XII RULES FOR CONSTRUCTION AND CONTINUED SERVICE OF TRANSPORT TANKS
Geometric Scope of the Pressure Vessel (a) The geometric scope of this Section shall, as a minimum, include the pressure-containing parts of pressure vessels up to and including the following: (1)...
July 1, 2009
SECTION XII RULES FOR CONSTRUCTION AND CONTINUED SERVICE OF TRANSPORT TANKS
A description is not available for this item.
July 1, 2008
SECTION XII RULES FOR CONSTRUCTION AND CONTINUED SERVICE OF TRANSPORT TANKS
A description is not available for this item.
July 1, 2007
SECTION XII RULES FOR CONSTRUCTION AND CONTINUED SERVICE OF TRANSPORT TANKS
A description is not available for this item.
July 1, 2006
SECTION XII RULES FOR CONSTRUCTION AND CONTINUED SERVICE OF TRANSPORT TANKS
A description is not available for this item.
July 1, 2005
SECTION XII RULES FOR CONSTRUCTION AND CONTINUED SERVICE OF TRANSPORT TANKS
A description is not available for this item.
July 1, 2004
SECTION XII RULES FOR CONSTRUCTION AND CONTINUED SERVICE OF TRANSPORT TANKS