NASA-LLIS-2716

Lessons Learned – Thermal Control System (TCS) Blanket Interference with Xo378 Bulkhead Vent Ports [Video Lesson]

active, Most Current
Organization: NASA
Publication Date: 8 April 2010
Status: active
Page Count: 4
scope:

Abstract:

TCS blankets by nature have a close and critical dimensional relationship to the surrounding hardware they are insulating. Blankets were installed incorrectly over the Purge Vent Drain (PVD) lines in the Forward Reaction Control System (FRCS). Incorrect installation allowed the blankets to billow toward the Xo 378 bulkhead vents, restricting venting of the FRCS cavity.

Document History

NASA-LLIS-2716
April 8, 2010
Lessons Learned – Thermal Control System (TCS) Blanket Interference with Xo378 Bulkhead Vent Ports [Video Lesson]
Abstract: TCS blankets by nature have a close and critical dimensional relationship to the surrounding hardware they are insulating. Blankets were installed incorrectly over the Purge Vent Drain...