WRI - CS 298-R-03

Case Study - Tunnel Construction - Washington DC's Metro Tunnel: An Advancement in Concrete Reinforcement

active, Most Current
Organization: WRI
Publication Date: 1 January 1998
Status: active
scope:

Washington, DC's Metro subway is among the world's highly regarded public transit systems. The 1.1 mile extension of the green line utilizes high strength welded wire reinforcement equivalent to the area of steel of #6 @ 6" as primary reinforcement and #4 @ 16" temperature/shrinkage reinforcement. The welded wire sheets were shipped radius bent.

Document History

CS 298-R-03
January 1, 1998
Case Study - Tunnel Construction - Washington DC's Metro Tunnel: An Advancement in Concrete Reinforcement
Washington, DC's Metro subway is among the world's highly regarded public transit systems. The 1.1 mile extension of the green line utilizes high strength welded wire reinforcement equivalent to the...