Case Study - Floor Framing - One Peachtree Office Tower, Atlanta, Georgia

active, Most Current
Organization: WRI
Publication Date: 1 January 1992
Status: active
scope:

Value engineering of the concrete floor framing system allowed a four-day/floor cycle that kept the tower on schedule

Document History

CS 193-R-03
January 1, 1992
Case Study - Floor Framing - One Peachtree Office Tower, Atlanta, Georgia
Value engineering of the concrete floor framing system allowed a four-day/floor cycle that kept the tower on schedule