UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

PIP RESR001

Packaged, Skid-Mounted Industrial Process Refrigeration Systems Specification

inactive
Buy Now
Organization: PIP
Publication Date: 1 October 2010
Status: inactive
Page Count: 36
scope:

This Practice describes the minimum requirements for the performance, design, fabrication, testing, inspection, and preparation for shipment of packaged, skidmounted process refrigeration systems. This Practice is not intended to cover commercial or absorption chiller systems.

Purpose

This Practice provides requirements for packaged, skid-mounted industrial process refrigeration systems.

Document History

March 1, 2018
Packaged, Skid-Mounted Industrial Process Refrigeration Systems Specification
This Practice describes the minimum requirements for the performance, design, fabrication, testing, inspection, and preparation for shipment of packaged, skid-mounted industrial process refrigeration...
PIP RESR001
October 1, 2010
Packaged, Skid-Mounted Industrial Process Refrigeration Systems Specification
This Practice describes the minimum requirements for the performance, design, fabrication, testing, inspection, and preparation for shipment of packaged, skidmounted process refrigeration systems....
February 1, 2008
Packaged, Skid-Mounted Industrial Process Refrigeration Systems Specification
This Practice describes the minimum requirements for the performance, design, fabrication, testing, inspection, and preparation for shipment of packaged, skid-mounted process refrigeration systems....
January 1, 2002
Packaged, Skid-Mounted Industrial Process Refrigeration
This Practice, along with the data sheet, appendix, and referenced attachments, defines the minimum requirements for the performance, design, fabrication, testing, inspection, and preparation for...

References

Advertisement