UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

ASME NUM-1

Rules for Construction of Cranes, Monorails, and Hoists (With Bridge or Trolley or Hoist of the Underhung Type)

inactive
Buy Now
Organization: ASME
Publication Date: 1 January 2009
Status: inactive
Page Count: 160
scope:

FOREWORD

The Committee on Cranes for Nuclear Power Plants was first established in 1976. In 1980, the scope of the Committee was revised, and its name was changed to the Committee on Cranes for Nuclear Facilities. In 1983, the Nuclear Underhung and Monorail (NUM) Subcommittee was established to develop a standard to cover the design, fabrication, installation, and testing of underhung and monorail equipment used in nuclear facilities. The NUM-1 Standard is the result of the Subcommittee's work.

The first edition of ASME NUM-1 was approved by the American National Standards Institute (ANSI) on October 28, 1996. The second edition of ASME NUM-1 was approved by ANSI on May 3, 2000. The third edition of ASME NUM-1 was approved by ANSI on August 17, 2004.

This Standard, or portions thereof, can be applied to cranes, monorails, and hoists at facilities other than nuclear where enhanced equipment safety may be required, and can be provided by means of either single failure-proof features, enhanced safety features, or a seismic design.

This Standard is split into four major sections: NUM-G, General Specifications (applicable to all equipment); NUM-I, Type I equipment (i.e., equipment that is used to handle critical loads and is required to withstand a seismic event); NUM-II, Type II equipment (i.e., equipment that is not used to handle critical loads and is required to withstand a seismic event); and NUM-III, Type III equipment (i.e., equipment that is not used to handle critical loads and is not required to withstand a seismic event).

Suggestions for the improvement of this Standard arewelcome. They should be addressed to the Secretary, ASME Committee on Cranes for Nuclear Facilities, The American Society of Mechanical Engineers, Three Park Avenue, New York, NY 10016-5990.

The 2009 edition of ASME NUM-1 was approved by ANSI on December 22, 2009.

Document History

June 30, 2016
Rules for Construction of Cranes, Monorails, and Hoists (With Bridge or Trolley or Hoist of the Underhung Type)
This Standard covers underhung cranes, top-running bridge and gantry cranes with underhung trolleys, travelingwall cranes, jib cranes, monorail systems, overhead 1 hoists, and hoists with integral...
ASME NUM-1
January 1, 2009
Rules for Construction of Cranes, Monorails, and Hoists (With Bridge or Trolley or Hoist of the Underhung Type)
FOREWORD The Committee on Cranes for Nuclear Power Plants was first established in 1976. In 1980, the scope of the Committee was revised, and its name was changed to the Committee on Cranes for...
January 1, 2004
Rules for Construction of Cranes, Monorails, and Hoists (With Bridge or Trolley or Hoist of the Underhung Type)
This Standard covers underhung cranes, top-running bridge and gantry cranes with underhung trolleys, traveling wall cranes, jib cranes, monorail systems, overhead hoists, and hoists with integral...
March 31, 2002
Addenda to ASME NUM-1-2000 Rules for Construction of Cranes, Monorails, and Hoists (with Bridge or Trolley or Hoist of the Underhung Type)
This Standard covers underhung cranes, top-running bridge and gantry cranes with underhung trolleys, traveling wall cranes, jib cranes, monorail systems, overhead hoists, and hoists with integral...
January 1, 2002
Addenda to ASME NUM-1-2000 Rules for Construction of Cranes, Monorails, and Hoists (with Bridge or Trolley or Hoist of the Underhung Type)
The Committee on Cranes for Nuclear Power Plants was first established in 1976. In 1980, the scope of the Committee was revised, and its name was changed to the Committee on Cranes for Nuclear...
September 18, 2000
Rules for Construction of Cranes, Monorails, and Hoists (with Bridge or Trolley or Hoist of the Underhung Type)
A description is not available for this item.
January 1, 1996
Rules for Construction of Cranes, Monorails, and Hoists (with Bridge or Trolley or Hoist of the Underhung Type)
A description is not available for this item.

References

Advertisement