UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

ACI 423.8R

Report on Corrosion and Repair of Grouted Multistrand and Bar Tendon Systems

active, Most Current
Buy Now
Organization: ACI
Publication Date: 1 October 2010
Status: active
Page Count: 14
scope:

This report includes a review and summary of the following:

• Guide specifications and training as applied to grouted post-tensioning tendons;

• Potential problem areas in grouted systems;

• Durability enhancements for each component of the tendon;

• Evaluation of corrosion problems; and

• Repair methods for grouted systems.

Document History

November 1, 2021
Corrosion and Repair of Grouted Post-Tensioning Tendon Systems—Report
This report includes a review and summary of the following: (a) Guide specifications and training as applied to grouted post-tensioning tendons (b) Quality control during construction (c)...
ACI 423.8R
October 1, 2010
Report on Corrosion and Repair of Grouted Multistrand and Bar Tendon Systems
This report includes a review and summary of the following: • Guide specifications and training as applied to grouted post-tensioning tendons; • Potential problem areas in grouted systems; •...

References

Advertisement