UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

API RP 53

RECOMMENDED PRACTICES for BLOWOUT PREVENTION EQUIPMENT SYSTEMS

inactive
Buy Now
Organization: API
Publication Date: 1 February 1978
Status: inactive
Page Count: 66
scope:

The purpose of these recommended practices is to provide accurate information that can serve as a guide for installation of blowout prevention equipment systems on land and marine rigs (barge, platform, bottom-supported, and floating). Blowout prevention equipment systems are composed off all systems required to operate the blowout preventers under varying rig and well conditions. These systems are namely - blowout preventers, kill line, choke manifold, closing unit, diverter, marine riser, and auxiliary equipment. The primary functions of these systems are to confine well fluids to the wellbore, provide means to add fluid to the wellbore, and allow controlled volumes to be withdrawn from the wellbore.

Several new sections have been added in this revised publication; namely, "Diverter Systems", "Inspection and Testing", "Sealing Components", "Blowout Preventer Modifications for Hydrogen Sulfide Service", "Pipe Stripping Arrangements", and "Marine Riser Systems". Although operations are being conducted in areas of extremely low temperatures, a section applicable to this service was not added since current practice generally results in protecting existing equipment from this environment. Procedures and techniques for blowout control have been omitted in this publication since they are beyond the scope of equipment systems contained herein.

Sections 2 through 10 of this publication have been prepared to contain a subsection pertaining to surface installations followed by a subsection for the equivalent subsea installation of blowout prevention equipment. A delineation was made between "surface" and "subsea" equipment installations so these recommended practice would also have utility in floating drilling operations. Unless stated otherwise, statements concerning surface equipment installations also apply to subsea equipment installations.

Equipment arrangements as set forth in this publication are adequate to meet specified well conditions. It is recognized that other arrangements may be equally effective in meeting well requirements and promoting safety and efficiency.

Document History

March 1, 1997
Recommended Practices for Blowout Prevention Equipment Systems for Drilling Wells
PURPOSE The purpose of these recommended practices is to provide information that can serve as a guide for installation and testing of blowout prevention equipment systems on land and marine...
March 1, 1997
Blowout Prevention Equipment Systems for Drilling Wells
PURPOSE The purpose of these recommended practices is to provide information that can serve as a guide for installation and testing of blowout prevention equipment systems on land and marine drilling...
May 25, 1984
RECOMMENDED PRACTICES FOR BLOWOUT PREVENTION EQUIPMENT SYSTEMS FOR DRILLING WELLS SECOND EDITION (WITHDRAWN)
A description is not available for this item.
API RP 53
February 1, 1978
RECOMMENDED PRACTICES for BLOWOUT PREVENTION EQUIPMENT SYSTEMS
The purpose of these recommended practices is to provide accurate information that can serve as a guide for installation of blowout prevention equipment systems on land and marine rigs (barge,...
Advertisement