NR/SMS/PART/C ISSUE 14
Signal Maintenance Specifications (SMS): Part C
| Organization: | NR |
| Publication Date: | 1 September 2018 |
| Status: | inactive |
| Page Count: | 1,063 |
scope:
GENERAL
This apparatus forms part of the pilot scheme for Automatic Train Protection Systems.
Any maintenance or operating difficulties shall be reported to your SM(S) as corrective maintenance.
An ATP site can include:
a) ATP enclosure containing encoding equipment and ATP interface equipment, which is incorporated with existing signalling apparatus.
b) Beacon with disconnection box and cables.
c) Infill loop with TDA and RDA boxes and cables.
Document History