UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

DOT - 46 CFR PART 119

MACHINERY INSTALLATION

active, Most Current
Organization: DOT
Publication Date: 1 October 2018
Status: active
Page Count: 12

Document History

October 1, 2022
MACHINERY INSTALLATION
A description is not available for this item.
46 CFR PART 119
October 1, 2018
MACHINERY INSTALLATION
A description is not available for this item.
October 1, 2017
MACHINERY INSTALLATION
Applicability to existing vessels. (a) Except as otherwise required by paragraphs (b) and (c) of this section, an existing vessel must comply with the regulations on machinery, bilge and ballast...
October 1, 2016
MACHINERY INSTALLATION
Intent; preemptive effect This part contains requirements for the design, construction, installation, and operation of propulsion and auxiliary machinery, piping and pressure systems steering...
October 1, 2015
MACHINERY INSTALLATION
Applicability to existing vessels. (a) Except as otherwise required by paragraphs (b) and (c) of this section, an existing vessel must comply with the regulations on machinery, bilge and ballast...
October 1, 2014
MACHINERY INSTALLATION
A description is not available for this item.

References

Advertisement