DOT - 46 CFR PART 119
MACHINERY INSTALLATION
active, Most Current
| Organization: | DOT |
| Publication Date: | 1 October 2018 |
| Status: | active |
| Page Count: | 12 |
Document History
October 1, 2022
MACHINERY INSTALLATION
A description is not available for this item.
46 CFR PART 119
October 1, 2018
MACHINERY INSTALLATION
A description is not available for this item.
October 1, 2017
MACHINERY INSTALLATION
Applicability to existing vessels.
(a) Except as otherwise required by paragraphs (b) and (c) of this section, an existing vessel must comply with the regulations on machinery, bilge and ballast...
October 1, 2016
MACHINERY INSTALLATION
Intent; preemptive effect
This part contains requirements for the design, construction, installation, and operation of propulsion and auxiliary machinery, piping and pressure systems steering...
October 1, 2015
MACHINERY INSTALLATION
Applicability to existing vessels.
(a) Except as otherwise required by paragraphs (b) and (c) of this section, an existing vessel must comply with the regulations on machinery, bilge and ballast...
October 1, 2014
MACHINERY INSTALLATION
A description is not available for this item.