NR/L3/ELP/27240/NR/C19B

Condition Assessment for HV & DC Distribution Assets

active, Most Current
Buy Now
Organization: NR
Publication Date: 1 March 2017
Status: active
Page Count: 15
scope:

This instruction applies to locations supplying the DC traction system; DC Substations (SS), Track Paralleling Huts (TPH) and Switching Locations (Sw).

Purpose

This document specifies the procedure to be followed so that HV & DC distribution assets undergo condition assessments in a correct and consistent manner in accordance with methodology specified. This activity is a requirement from the Office of Rail Regulation for the collection of asset condition data.

Document History

NR/L3/ELP/27240/NR/C19B
March 1, 2017
Condition Assessment for HV & DC Distribution Assets
This instruction applies to locations supplying the DC traction system; DC Substations (SS), Track Paralleling Huts (TPH) and Switching Locations (Sw). Purpose This document specifies the procedure...

References

Advertisement