UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR/SIN/188

Removal of Howells BR985 (Mk2) Re-Engineered Hydraulic Level Crossing Barrier Packs

active, Most Current
Buy Now
Organization: NR
Publication Date: 11 March 2019
Status: active
Page Count: 7
scope:

This SIN applies to all BR843 level crossing barrier cabinets fitted with Howells BR985 (Mk2) re-engineered hydraulic level crossing barrier packs (Cat No. R086/027184).

Purpose

The purpose of this Special Inspection Notice (SIN) is to instruct the removal of Howells BR985 (Mk2) re-engineered hydraulic level crossing barrier packs (Cat No. R086/027184) from Network Rail managed infrastructure and install a replacement using SPX BR985 (Mk2) hydraulic level crossing barrier packs (Cat No. 086/027218 or R086/027218)

Document History

NR/SIN/188
March 11, 2019
Removal of Howells BR985 (Mk2) Re-Engineered Hydraulic Level Crossing Barrier Packs
This SIN applies to all BR843 level crossing barrier cabinets fitted with Howells BR985 (Mk2) re-engineered hydraulic level crossing barrier packs (Cat No. R086/027184). Purpose The purpose of this...

References

Advertisement