UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

GMW-R - GMW15704

Fuel Filler and Charge Port Door System Checkload

active, Most Current
Organization: GMW-R
Publication Date: 1 August 2018
Status: active
Page Count: 8
scope:

Introduction

Note: Nothing in this standard supercedes applicable laws and regulations.

Note: In the event of conflict between the English and domestic language, the English language shall take precedence.

Purpose. The purpose of this procedure is to determine if a fuel filler or charge port door system meets the checkload requirements of the appropriate Subsystem Technical Specifications (SSTS).

Applicability. This procedure applies to all cars and trucks which utilize a hinged door to cover the fuel filler or charge port pocket and cap.

Remarks. The fuel filler or charge port door may undergo checkload testing as part of a durability test (GMW15659).

Document History

GMW15704
August 1, 2018
Fuel Filler and Charge Port Door System Checkload
Introduction Note: Nothing in this standard supercedes applicable laws and regulations. Note: In the event of conflict between the English and domestic language, the English language shall take...

References

Advertisement