UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

DSF/EN 13232-8/FprA1

Railway applications - Track - Switches and crossings - Part 8: Expansion devices

inactive
Organization: DS
Status: inactive
Page Count: 8
ICS Code (Rails and railway components): 45.080
scope:

This part of EN 13232 covers the following subjects: to establish a working terminology for expansion devices, for their constituent parts and for the types; to specify the minimum manufacturing requirements for expansion devices and their constituent parts; to formulate codes of practice for inspection and tolerances; to define the method by which expansion devices and their parts should be identified and traced.

Document History

October 17, 2023
Railway applications – Track – Switches and crossings for Vignole rails – Part 8: Expansion devices
A description is not available for this item.
December 2, 2011
Railway applications - Track - Switches and crossings - Part 8: Expansion devices
This part of EN 13232 covers the following subjects: to establish a working terminology for expansion devices, for their constituent parts and for the types; to specify the minimum manufacturing...
May 10, 2007
Railway applications - Track - Switches and crossings - Part 8: Expansion devices
This part of EN 13232 covers the following subjects: to establish a working terminology for expansion devices, for their constituent parts and for the types; to specify the minimum manufacturing...
DSF/EN 13232-8/FprA1
Railway applications - Track - Switches and crossings - Part 8: Expansion devices
This part of EN 13232 covers the following subjects: to establish a working terminology for expansion devices, for their constituent parts and for the types; to specify the minimum manufacturing...
Railway applications - Track - Switches and crossings for Vignole rails - Part 8: Expansion devices
The same as for EN 13232-8:2007+A1:2011.
Railway applications – Track – Switches and crossings for Vignole rails – Part 8: Expansion devices
This part of EN 13232 covers the following subjects: to establish a working terminology for expansion devices, for their constituent parts and for the types; to specify the minimum manufacturing...
Advertisement