ASTM International - ASTM F1606-19

Standard Practice for Rehabilitation of Existing Sewers and Conduits with Deformed Polyethylene (PE) Liner

active
Buy Now
Organization: ASTM International
Publication Date: 1 November 2019
Status: active
Page Count: 6
ICS Code (Plastics pipes): 23.040.20
significance And Use:

4.1 This practice is to provide guidance for designers and specifiers, regulatory agencies, owners, and inspection organizations who are involved in the rehabilitation of conduits. Modifications... View More

scope:

1.1 This practice covers the requirements for the installation of deformed polyethylene (PE) liner for pipeline rehabilitation.

1.2 This practice describes a method by which the PE liner may be installed with little or no excavation.

1.3 This practice applies to the rehabilitation of 3 to 18 in. (76 to 457 mm) diameter pipe in terms of installation. The specifier determines what DR is used based on conditions of the specific application.

1.4 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety, health, and environmental practices and determine the applicability of regulatory limitations prior to use.

1.5 This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.

Document History

ASTM F1606-19
November 1, 2019
Standard Practice for Rehabilitation of Existing Sewers and Conduits with Deformed Polyethylene (PE) Liner
1.1 This practice covers the requirements for the installation of deformed polyethylene (PE) liner for pipeline rehabilitation. 1.2 This practice describes a method by which the PE liner may be...
March 1, 2014
Standard Practice for Rehabilitation of Existing Sewers and Conduits with Deformed Polyethylene (PE) Liner
1.1 This practice covers the requirements for the installation of deformed polyethylene (PE) liner for pipeline rehabilitation. 1.2 This practice describes a method by which the PE liner may be...
November 15, 2005
Standard Practice for Rehabilitation of Existing Sewers and Conduits with Deformed Polyethylene (PE) Liner
1.1 This practice covers the requirements for the installation of deformed polyethylene (PE) liner for pipeline rehabilitation. 1.2 This practice describes a method by which the PE liner may be...
January 1, 1995
Standard Practice for Rehabilitation of Existing Sewers and Conduits with Deformed Polyethylene (PE) Liner (Withdrawn 2004)
1.1 This practice covers the requirements for the installation of deformed polyethylene (PE) liner for pipeline rehabilitation. 1.2 This practice describes a method by which the PE liner may be...