NR - SSI8003-66 ISSUE 8
SSI Data Preparation - Restoration of Points (aka RT/SSI/8003-66)
| Organization: | NR |
| Publication Date: | 4 June 2011 |
| Status: | inactive |
| Page Count: | 26 |
scope:
Introduction
Signalling Principles Standard GK/RT0064 provides for certain points to be automatically restored to normal, or for the Signaller to be given a visual indication to remind him/her to set the points normal. A visual indication is also given if unreleased route locking is preventing automatic restoration of the points or if the points have failed to respond to an automatic restoration call.
Document History