UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR - RT/CE/S/071 ISSUE 1

Design of Earthworks and Earthwork Remediations

inactive
Organization: NR
Publication Date: 1 August 2003
Status: inactive
Page Count: 34
scope:

This Specification applies to the design of all Earthworks and Earthwork Remediations for which Network Rail is wholly or partially responsible, where instability or failure could affect the safety of train operations and/or the safety of others and/or cause damage to property.

Subject to the above qualifications, the following are included:

(a) Earthworks (embankments, soil cuttings and rock cuttings) and remediation works to existing Earthworks;

(b) Remediation works to natural slopes (soil and rock) owned or controlled by Network Rail;

(c) Earthworks and Earthwork Remediations for which Network Rail is responsible to the extent that it has a duty to others to maintain and support (e.g. approach embankments to overline bridges);

(d) Gabions, piles and other Structural Elements associated with or forming part of Earthworks and Earthwork Remediations;

(e) Retaining walls other than those given in (f) below.

The following are excluded:

(f) Retaining walls associated with, or ancillary to, or forming part of, structures such as a bridges, culverts and tunnel portals.

(g) Foundations constructed on or within Earthworks or Earthwork Remediations (e.g. foundations for signal or electrification structures); the analysis of the effects of such foundations on the Earthworks are, however, included.

(h) The Permanent Way.

Purpose

The purpose of this Specification is to set out requirements for the design of Earthworks and Earthwork Remediations for which Network Rail is wholly or partially responsible, with the aims of ensuring that such Earthworks will perform safely and satisfactorily in service and that they can be constructed with reasonable economy.

This Specification is intended to ensure compliance with the requirements of Railway Group Standard GC/RT5110 Design Requirements for Structures as regards Earthworks.

Document History

June 4, 2011
Geotechnical Design
This standard is applicable to all types of ‘structure', which is defined in BS EN 1990: Basis of structural design as an ‘organised combination of connected parts, including fill placed during...
March 6, 2010
Geotechnical Design
This standard is applicable to all types of ‘structure', which is defined in BS EN 1990: Basis of structural design as an ‘organised combination of connected parts, including fill placed during...
August 7, 2004
Design of Earthworks, Earthworks Remediations & Geotechnical Aspects of Foundations for Structures (aka NR/SP/CIV/071)
This Specification applies to the Design of all Earthworks, Earthwork Remediations and geotechnical aspects of foundations for structures as identified below, for which Network Rail is wholly or...
RT/CE/S/071 ISSUE 1
August 1, 2003
Design of Earthworks and Earthwork Remediations
This Specification applies to the design of all Earthworks and Earthwork Remediations for which Network Rail is wholly or partially responsible, where instability or failure could affect the safety...

References

Advertisement