UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

LUL - T0526

Signalling equipment overhaul specification K trainstop

inactive
Organization: LUL
Publication Date: 1 November 2011
Status: inactive
Page Count: 47
scope:

This Specification is written to comply with Engineering Standard 1-202 in defining the requirements for the overhaul of all variants of K type Trainstops which are used extensively in the signalling system on the London Underground.

The specification hierarchy which supports these requirements is detailed in Attachment 4 to the Specification.

Document History

June 1, 2022
Signalling equipment overhaul specification K trainstop
This specification should be used by all those when engaged in the overhaul of all variants of K type Trainstops which are used in signalling systems on the London Underground. This specification is...
April 1, 2017
Signalling equipment overhaul specification K trainstop
This specification is written to comply with engineering standard S1202 ‘Signal Equipment Overhaul’ in defining the requirements for the overhaul of all variants of K type Trainstops which are used...
December 1, 2015
Signalling equipment overhaul specification K trainstop
This Specification is written to comply with Engineering Standard 1-202 in defining the requirements for the overhaul of all variants of K type Trainstops which are used extensively in the signalling...
T0526
November 1, 2011
Signalling equipment overhaul specification K trainstop
This Specification is written to comply with Engineering Standard 1-202 in defining the requirements for the overhaul of all variants of K type Trainstops which are used extensively in the signalling...

References

Advertisement