UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR - RT/CE/S/064 ISSUE 1

Process for the Assembly of BR MkIII 4- and 6-Hole Glued Insulated Joints (aka NR/SP/TRK/064)

inactive
Organization: NR
Publication Date: 1 March 1996
Status: inactive
Page Count: 13
scope:

This specification covers the assembly, in a workshop environment, of BR MkIII glued insulated rail joints. It is the responsibility of the manufacturer to ensure that the operations described are carried out safely.

PURPOSE

To set out the process for the assembly of BR MkIII glued insulated rail joints, so that when installed in Railtrack's infrastructure they are reliable and durable.

Document History

December 1, 2003
Assembly of BR MkIII 4- and 6-Hole Insulated Joints (aka NR/SP/TRK/064)
This specification covers the assembly, in a workshop environment, of BR MkIII glued insulated rail joints. Note: The BR MkIII joint is designed for 113A (56E1) rail. The design is owned by Network...
RT/CE/S/064 ISSUE 1
March 1, 1996
Process for the Assembly of BR MkIII 4- and 6-Hole Glued Insulated Joints (aka NR/SP/TRK/064)
This specification covers the assembly, in a workshop environment, of BR MkIII glued insulated rail joints. It is the responsibility of the manufacturer to ensure that the operations described are...

References

Advertisement