UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR - SSI8003-83 ISSUE 3

SSI Data Preparation - Permissive Controls

inactive
Organization: NR
Publication Date: 4 June 2011
Status: inactive
Page Count: 31
scope:

Introduction

Permissive controls are applied to minimise the risk of collision between two trains, the second having been signalled onto a running line which is already occupied by the first. The requirements for controlling such a risk are stated in Signalling Principle Standard GK/RT0044 (ref.1) and SSI8003-83 is based on these requirements.

Document History

June 2, 2012
SSI Data Preparation Permissive Controls
Introduction Permissive controls are applied to minimise the risk of collision between two trains, the second having been signalled onto a running line which is already occupied by the first. The...
SSI8003-83 ISSUE 3
June 4, 2011
SSI Data Preparation - Permissive Controls
Introduction Permissive controls are applied to minimise the risk of collision between two trains, the second having been signalled onto a running line which is already occupied by the first. The...

References

Advertisement