UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR - SSI8003-56 ISSUE 2

SSI Data Preparation - Signal Group Replacement Control (aka RT/SSI/8003-56)

inactive
Organization: NR
Publication Date: 4 December 2010
Status: inactive
Page Count: 11
scope:

Introduction

Railtrack Line Specification RT/E/S/10131 Issue 1 specifies two separate functions:

• Emergency Signals On Control (ESOC), which affects all signals within an interlocking, and is independent of the CI and Control Centre hardware, programs and data.

• Signal Group Replacement Control (SGRC), which provides an operational function affecting a group of signals. This relies on the correct operation of the CI and Control System.

ESOC is only intended for use when technical failure may render the normal means of signal replacement inoperable. Details for implementing ESOC are contained in SSI8500, primarily in Chapter F.

Details for implementing SGRC follow below.

Document History

September 5, 2015
Signal Group Replacement Control
Introduction Company standard NR/L2/SIG/10131 (Issue 1) specifies two separate functions: • Emergency Signals On Control (ESOC), which affects all signals within an interlocking, and is independent...
SSI8003-56 ISSUE 2
December 4, 2010
SSI Data Preparation - Signal Group Replacement Control (aka RT/SSI/8003-56)
Introduction Railtrack Line Specification RT/E/S/10131 Issue 1 specifies two separate functions: • Emergency Signals On Control (ESOC), which affects all signals within an interlocking, and is...

References

Advertisement