PIP PCFTE100
Thermowell Fabrication Details
active, Most Current
Buy Now
| Organization: | PIP |
| Publication Date: | 1 April 2014 |
| Status: | active |
| Page Count: | 8 |
scope:
This Practice describes the minimum requirements for fabricating threaded, flanged, weld-in, and socketweld tapered thermowells.
Document History
PIP PCFTE100
April 1, 2014
Thermowell Fabrication Details
This Practice describes the minimum requirements for fabricating threaded, flanged, weld-in, and socketweld tapered thermowells.
April 1, 2014
Thermowell Fabrication Details
This Practice describes the minimum requirements for fabricating threaded, flanged, weld-in, and socketweld tapered thermowells.
Purpose
This Practice provides fabrication details for thermowells.
July 1, 2008
Thermowell Fabrication Details
This Practice describes the minimum requirements for fabricating threaded, flanged, weld-in, and socketweld tapered thermowells.
Purpose
This Practice provides fabrication details for thermowells.