NG UKBP/TP 162
UK Business Procedure/Transmission Procedures - Contingency Plans in Case of Failure of Numerical Busbar Protections
active, Most Current
Buy Now
| Organization: | NG |
| Publication Date: | 1 December 2018 |
| Status: | active |
| Page Count: | 18 |
scope:
PURPOSE AND SCOPE
This procedure details the requirements for the preparation of contingency plans to be implemented in the event of a failure, unplanned outage, planned depletion or asset replacement of a complete numerical busbar protection system fitted at a 400 or 275kV double busbar substation.
Document History
NG UKBP/TP 162
December 1, 2018
UK Business Procedure/Transmission Procedures - Contingency Plans in Case of Failure of Numerical Busbar Protections
PURPOSE AND SCOPE
This procedure details the requirements for the preparation of contingency plans to be implemented in the event of a failure, unplanned outage, planned depletion or asset...
May 1, 2014
UK Business Procedure/Transmission Procedures - Contingency Plans in Case of Failure of Numerical Busbar Protections
PURPOSE AND SCOPE
This procedure provides details for the preparation of contingency plans to be implemented in the event of a failure or unplanned outage of a complete numerical busbar protection...
June 1, 2007
UK Business Procedure/Transmission Procedures - Contingency Plans in Case of Failure of Numerical Busbar Protections
PURPOSE AND SCOPE
This document provides details for the preparation of contingency plans to be implemented in the event of a failure or unplanned outage of a complete numerical busbar protection...