FAA-C-1391 REV C
INSTALLATION AND SPLICING OF UNDERGROUND CABLES
inactive
| Organization: | FAA |
| Publication Date: | 1 May 2012 |
| Status: | inactive |
| Page Count: | 75 |
Document History
September 1, 2014
INSTALLATION, TERMINATION, SPLICING, AND TRANSIENT/SURGE PROTECTION OF UNDERGROUND ELECTRICAL DISTRIBUTION SYSTEM POWER CABLES
This specification defines the minimum requirements for the installation of medium voltage and low voltage (600 V) electrical line distribution (ELD) power cables buried directly in the earth or...
FAA-C-1391 REV C
May 1, 2012
INSTALLATION AND SPLICING OF UNDERGROUND CABLES
A description is not available for this item.
January 25, 1991
INSTALLATION AND SPLICING OF UNDERGROUND CABLES
This specification covers minimum requirements for installation of electrical cables buried directly in the earth or installed in underground duct or conduit. It includes trenching, installation and...
December 4, 1973
INSTALLATION AND SPLICING OF UNDERGROUND CABLES
This specification covers minimum requirements for installation of electrical cables buried directly in the earth or installed in underground duct or conduit. It includes trenching, installation and...