AENOR - UNE-EN 60909-3
Short-circuit currents in three-phase a.c systems -- Part 3: Currents during two separate simultaneous line-to-earth short-circuits and partial short-circuit currents flowing through earth
active, Most Current
| Organization: | AENOR |
| Publication Date: | 19 January 2011 |
| Status: | active |
| Page Count: | 64 |
| ICS Code (Power transmission and distribution lines): | 29.240.20 |
| ICS Code (Electricity. Magnetism. General aspects): | 17.220.01 |
Document History
UNE-EN 60909-3
January 19, 2011
Short-circuit currents in three-phase a.c systems -- Part 3: Currents during two separate simultaneous line-to-earth short-circuits and partial short-circuit currents flowing through earth
A description is not available for this item.
November 12, 2004
Short-circuit currents in three-phase a.c systems -- Part 3: Currents during two separate simultaneous line-to-earth short-circuits and partial short-circuit currents flowing through earth
A description is not available for this item.