AENOR - UNE 60670-4 ERTA
Gas installations pipework supplied at maximum operating pressure (MOP) up to and including 5 bar. Part 4: Design and construction.
inactive
| Organization: | AENOR |
| Publication Date: | 31 October 2007 |
| Status: | inactive |
| Page Count: | 2 |
| ICS Code (Gas supply systems): | 91.140.40 |
Document History
October 4, 2023
Gas installations pipework supplied at maximum operating pressure (MOP) up to and including 5 bar. Part 4: Design and construction.
A description is not available for this item.
July 9, 2014
Gas installations pipework supplied at maximum operating pressure (MOP) up to and including 5 bar. Part 4: Design and construction.
A description is not available for this item.
UNE 60670-4 ERTA
October 31, 2007
Gas installations pipework supplied at maximum operating pressure (MOP) up to and including 5 bar. Part 4: Design and construction.
A description is not available for this item.
June 8, 2005
Gas installations pipework supplied at maximum operating pressure (MOP) up to and including 5 bar. Part 4: Design and construction.
A description is not available for this item.
December 3, 1999
GAS INSTALLATIONS FOR DOMESTIC, COLLECTIVE OR COMMERCIAL PREMISES. PART 4: DESIGN AND CONSTRUCTION.
A description is not available for this item.
February 19, 1993
GAS INSTALLATIONS FOR DOMESTIC, COLLECTIVE OR COMMERCIAL PREMISES. PART 4: PREMISES OF METERS INSTALLATIONS.
A description is not available for this item.