NR/L3/TRK/7014

Inspection and Maintenance of Permanent Way Using Risk Based Maintenance (Plain Line CWR Track)

active, Most Current
Buy Now
Organization: NR
Publication Date: 6 March 2021
Status: active
Page Count: 54
scope:

This standard applies to revised inspection and maintenance regimes for plain line track system assessed using the Reliability Centred Maintenance process (NR/L2/MTC/10662) of the following assets on running lines:

a) plain line flat bottom Continuously Welded Rail (CWR) - Regardless of PLPR status;

b) line speed 125mph or less; and

c) axles loads 25.5tonnes or less.

The scope of this standard excludes:

d) switches & crossings;

e) bull head rail;

f) adjustment switches;

g) jointed track;

h) buffer stops;

i) slab track;

j) long timber bridges;

k) complex or non-standard layouts;

l) off track features (fences / none track drainage / vegetation); and

m) non-running lines

NOTE: These excluded assetsl continue to be inspected and maintained as mandated in modules NR/L2/TRK/001 unless bespoke Risk Based Maintenance regimes are agreed and implemented as per NR/L2/MTC/10662

The scope of this standard excludes the following inspections:

n) Track Maintenance Engineer inspections

o) Super Red' inspections

p) 'Very Poor' eighth inspections

Purpose

This standard defines alternative inspection and maintenance regimes to those mandated in NR/L2/TRK/001 based on the application of Risk Based Maintenance (RBM). This simplifies the implementation of Risk Based Maintenance regimes detailed in NR/L2/MTC/10662/05.

Document History

March 5, 2022
Standardised Risk Based Maintenance Regime (RBM) for the Inspection and Maintenance of the Permanent Way (aka NR/L3/TRK/7014)
This manual applies to the implementation, operation and assurance of inspection and maintenance regimes for the track system assessed using the Reliability Centred Maintenance process...
NR/L3/TRK/7014
March 6, 2021
Inspection and Maintenance of Permanent Way Using Risk Based Maintenance (Plain Line CWR Track)
This standard applies to revised inspection and maintenance regimes for plain line track system assessed using the Reliability Centred Maintenance process (NR/L2/MTC/10662) of the following assets on...

References

Advertisement