UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR/L2/OTK/5100/MOD03

Boundary Measure Management Manual: Boundary Measure Specification

active, Most Current
Buy Now
Organization: NR
Publication Date: 6 March 2021
Status: active
Page Count: 18
scope:

This module covers the design, installation and performance of boundary measures and non-operational land barrier specifications to be installed on land owned by Network Rail (NR).

It applies to all boundary measure renewal activities, including like for like, upgrades or enhancements.

It applies to anyone who installs boundary measures for or on behalf of Network Rail.

NOTE: (examples include, Works Delivery, Capital Delivery, Maintenance Delivery Units and NR approved contractors)

Not included within this module are;

a) Existing/legacy boundary measures e.g. this standard is not retrospective

b) Acoustic fences e.g. these should (when installed) be standalone assets

c) Other structures on the boundary measure e.g. third-party buildings or structures

d) Barriers and fences that are not boundary measures e.g. fall protection measures, fencing around electrical rooms, etc.

e) Prevention of incursion by wild or exotic animals e.g. deer, ostrich, llama etc.

f) Other barriers that can be used as boundary measures that are not constructed e.g. ditches, watercourses and hedges

g) Retaining walls (Route Asset Manager or equivalent (RAM[OE]) structures specification)

h) Road vehicle incursion barriers

Document History

September 3, 2022
Boundary Measure Management Manual: Boundary Measure Specification
This module covers the design, installation and performance of boundary measures and non-operational land barrier specifications to be installed on land owned by Network Rail (NR). It applies to all...
NR/L2/OTK/5100/MOD03
March 6, 2021
Boundary Measure Management Manual: Boundary Measure Specification
This module covers the design, installation and performance of boundary measures and non-operational land barrier specifications to be installed on land owned by Network Rail (NR). It applies to all...