Recommended Practice for Operation of 300 MW to 600 MW Pulverized Coal-Fired Boiler

active, Most Current
Organization: IEEE
Publication Date: 9 February 2021
Status: active
Page Count: 74
scope:

This recommended practice defines the principles and procedures for start-up, normal operation, shutdown, daily operation, and maintenance during normal and emergency conditions for a 300 MW to 600 MW pulverized coal-fired boiler and its main auxiliary equipment. This recommended practice applies to 300 MW to 600 MW pulverized coal-fired boilers with a balanced draft, including natural circulation and forced circulation; subcritical and supercritical once-through boilers; tangential-fired boilers; opposed-fired boilers; and so on. For specific applications, an additional document needs to be formulated by users based on this recommended practice to cover detailed procedures or normally so-called "operation code," together with the instructions of manufacturers and the experiences derived from normal operation practice.

Document History

2777
February 9, 2021
Recommended Practice for Operation of 300 MW to 600 MW Pulverized Coal-Fired Boiler
This recommended practice defines the principles and procedures for start-up, normal operation, shutdown, daily operation, and maintenance during normal and emergency conditions for a 300 MW to 600...