NAVY - OPNAV F3501.407
(N98) REQUIRED OPERATIONAL CAPABILITY AND PROJECTED OPERATIONAL ENVIRONMENT FOR FLEET LOGISTICS SUPPORT MULTI-MISSION SQUADRON FIVE ZERO FLEET REPLACEMENT SQUADRON
| Organization: | NAVY |
| Publication Date: | 17 March 2021 |
| Status: | active |
| Page Count: | 19 |
scope:
Scope and Applicability.
Enclosures (1) and (2) have been prepared per references (a) through (c). The ROC and POE provide the necessary details to describe the mission areas, environment and operational capabilities for which VRM-50 FRS is configured. This instruction provides resource sponsors and agencies with information concerning VRM-50 FRS mission requirements, capabilities, as well the types and locations of expected operations. Together, the ROC and POE establish tasking which produces measurable workload used by the Navy Manpower Analysis Center to compute manpower requirements for VRM-50 FRS manpower document.
Purpose.
To issue the revised Required Operational Capabilities (ROC) and Projected Operational Environment (POE) for Fleet Logistics Support Multi-Mission Squadron FIVE ZERO (VRM-50) Fleet Replacement Squadron (FRS). This instruction is a complete revision and should be reviewed in its entirety.
Document History