UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NCMA - TR 146A

Segmental Retaining Wall Installation Guide

active, Most Current
Organization: NCMA
Publication Date: 8 January 2020
Status: active
scope:

CATS Abstract:

This guide provides an overview for contractors and owners for the correct and successful installation of Segmental Retaining Wall (SRW) systems, addressing the specific installation steps for engineered and non-engineered SRW systems. Before starting any size project the user should be familiar with the local code requirements for retaining walls to determine the engineering needs of the job, if no guidelines are given refer to TEK 18-11 for NCMA recommendations. If engineering is not required, the user should reference the design charts of the block and geogrid manufacturers, however, when engineering is necessary the approved documents should be strictly followed. The information provided here covers the general installation guidelines for SRWs, site specific conditions should be appropriately evaluated by a qualified engineer. Users should reference the product-specific information provided by the block, geogrid and geotextile manufacturers for additional information unique to each system.

Document History

TR 146A
January 8, 2020
Segmental Retaining Wall Installation Guide
CATS Abstract: This guide provides an overview for contractors and owners for the correct and successful installation of Segmental Retaining Wall (SRW) systems, addressing the specific installation...
Advertisement