UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

ASABE - S268.7

Terrace Systems

active, Most Current
Organization: ASABE
Publication Date: 1 July 2021
Status: active
Page Count: 11
scope:

Purpose and Scope

This Standard is intended as a guide to engineers and technicians for the design, layout, construction and maintenance of terrace systems on cropland. Terraces are earth embankments and channels constructed across the crop field slope at suitable spacing and with acceptable grades to reduce soil erosion and trap sediment, and/or to retain moisture for crop use.This Standard applies where sheet and rill or gully erosion is a problem, or there is a need to manage runoff leaving a site. The soils and site conditions must be suitable to build an earth embankment. The site must provide an adequate outlet.

Terraces alone may not provide adequate control of erosion and runoff on sloping lands. Used in combination with water and sediment control basins, diversions, grassed waterways, contouring, conservation cropping systems, conservation tillage, crop residue management, and/or permanent vegetation, they can be part of a resource management system to protect the soil and water resource base.

Document History

S268.7
July 1, 2021
Terrace Systems
Purpose and Scope This Standard is intended as a guide to engineers and technicians for the design, layout, construction and maintenance of terrace systems on cropland. Terraces are earth...
March 1, 2017
Terrace Systems
Purpose and Scope This Standard is intended as a guide to engineers and technicians for the design, layout, construction and maintenance of terrace systems on cropland. Terraces are earth...
January 1, 2012
Design, Layout, Construction, and Maintenance of Terrace Systems
Purpose and Scope This Standard is intended as a guide to engineers and technicians for the design, layout, construction and maintenance of terrace systems on cropland that uses modern equipment and...
January 1, 2012
Design, Layout, Construction, and Maintenance of Terrace Systems
Purpose and Scope This Standard is intended as a guide to engineers and technicians for the design, layout, construction and maintenance of terrace systems on cropland that uses modern equipment and...
February 1, 2003
Design, Layout, Construction and Maintenance of Terrace Systems
A description is not available for this item.
December 1, 1997
Design, Layout, Construction and Maintenance of Terrace Systems
A description is not available for this item.
December 1, 1996
Design, Layout, Construction and Maintenance of Terrace Systems
A description is not available for this item.
April 1, 1992
Design, Layout, Construction and Maintenance of Terrace Systems
A description is not available for this item.

References

Advertisement