LUL - G198D

Signalling Installation

active, Most Current
Organization: LUL
Publication Date: 1 July 2021
Status: active
Page Count: 255
scope:

All those engaged with the modification and update the LU's legacy signalling systems, should use this guidance when undertaking installation work.

Purpose

This document provides guidance for the installation, testing and commissioning of asset types and equipment associated with LU's legacy signalling systems, which comprises two aspect signalling with AC fed track circuits, plus mechanical trainstops and interlocking.

Note: The purpose of this covering document is to enable continuity of signalling documentation, consistency of document numbering and provide traceability through the recorded document history. It is not proposed to update the existing document S&CSE ST0021-A2 'Signalling Handbook Standards', but rather keep it as historical reference.

Document History

G198D
July 1, 2021
Signalling Installation
All those engaged with the modification and update the LU’s legacy signalling systems, should use this guidance when undertaking installation work. Purpose This document provides guidance for the...