UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

GMW15803

Performance Test for Connections Used in Charge Air Systems

active, Most Current
Organization: GMW
Publication Date: 1 August 2021
Status: active
Page Count: 17
scope:

Purpose/Material Description.

This standard defines the requirements for connections, e.g., quick connectors, clamps etc., used on both the cold and hot side of pressurized charge air cooler (CAC) duct systems.

Document History

GMW15803
August 1, 2021
Performance Test for Connections Used in Charge Air Systems
Purpose/Material Description. This standard defines the requirements for connections, e.g., quick connectors, clamps etc., used on both the cold and hot side of pressurized charge air cooler (CAC)...
April 1, 2015
Performance Test for Connections Used in Charge Air Systems
Introduction Note: Nothing in this standard supercedes applicable laws and regulations. Note: In the event of conflict between the English and domestic language, the English language shall take...
August 1, 2009
Charge Air Cooler Connections and Quick-Connector Assemblies
This standard defines the requirements for connections used on both the cold and hot side of pressurized charge air cooler (CAC) duct systems. These systems are typically used with either gasoline or...

References

Advertisement