DS/IEC TS 63042-302

UHV AC transmission systems – Part 302: Commissioning

active, Most Current
Organization: DS
Publication Date: 11 October 2021
Status: active
Page Count: 62
ICS Code (Substations. Surge arresters): 29.240.10
ICS Code (Power transmission and distribution networks in general): 29.240.01
scope:

IEC TS 63042-302:2021(E) applies to the commissioning of UHV AC transmission systems. It mainly specifies the test purposes, test items, test preconditions, test methods and test acceptance criteria during pre-commissioning and system commissioning. Also, the measurement requirements for system commissioning are specified.

Document History

DS/IEC TS 63042-302
October 11, 2021
UHV AC transmission systems – Part 302: Commissioning
IEC TS 63042-302:2021(E) applies to the commissioning of UHV AC transmission systems. It mainly specifies the test purposes, test items, test preconditions, test methods and test acceptance criteria...