UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

E935

Standard Test Methods for PERFORMANCE OF PERMANENT METAL RAILING SYSTEMS AND RAILS FOR BUILDING

inactive
Publication Date: 10 June 1983
Status: inactive
Page Count: 7
ICS Code (Ceilings. Floors. Stairs): 91.060.30
scope:

These test methods describe procedures to be followed in testing the performance of permanent metal railing systems (guard, stair, and ramp-rail systems) and rails (hand, wall, grab, and transfer rails) installed in and for agricultural, assembly, commercial, educational, industrial, institutional, recreational, and residential buildings.

These test methods can be used to determine whether permanent metal railing systems and rails comply with anticipated performance requirements.

Specifically, these test methods cover procedures for determining the static strength of metal railing systems and rails as structural elements when installed and fastened to concrete, masonry, wood, and metal as well as related products.

No consideration is given in these test methods to any possible deterioration of metal railing systems, rails, and connections resulting from adverse environmental conditions. The performance of special tests covering this aspect may be desirable.

Should computations make it possible to provide the needed information, testing may be employed for verification.

Document History

August 1, 2021
Standard Test Methods for Performance of Permanent Metal Railing Systems and Rails for Buildings
These test methods cover procedures to be followed in testing the performance of permanent metal railing systems (guard, stair, and ramp-rail systems), including components such as rails (hand, wall,...
April 1, 2013
Standard Test Methods for Performance of Permanent Metal Railing Systems and Rails for Buildings
These test methods cover procedures to be followed in testing the performance of permanent metal railing systems (guard, stair, and ramp-rail systems), including components such as rails (hand, wall,...
April 1, 2013
Standard Test Methods for Performance of Permanent Metal Railing Systems and Rails for Buildings
These test methods cover procedures to be followed in testing the performance of permanent metal railing systems (guard, stair, and ramp-rail systems), including components such as rails (hand, wall,...
March 10, 2000
Standard Test Methods for Performance of Permanent Metal Railing Systems and Rails for Buildings
These test methods cover procedures to be followed in testing the performance of permanent metal railing systems (guard, stair, and ramp-rail systems) and rails (hand, wall, grab, and transfer rails)...
March 10, 2000
Standard Test Methods for Performance of Permanent Metal Railing Systems and Rails for Buildings
1. Scope 1.1 These test methods describe procedures to be followed in testing the performance of permanent metal railing systems (guard, stair, and ramp-rail systems) and rails (hand, wall, grab, and...
November 15, 1993
Standard Test Methods for Performance of Permanent Metal Railing Systems and Rails for Buildings
1. Scope 1.1 These test methods describe procedures to be followed in testing the performance of permanent metal railing systems (guard, stair, and ramp-rail systems) and rails (hand, wall, grab, and...
November 15, 1993
Standard Test Methods for Performance of Permanent Metal Railing Systems and Rails for Buildings
These test methods describe procedures to be followed in testing the performance of permanent metal railing systems (guard, stair, and ramp-rail systems) and rails (hand, wall, grab, and transfer...
August 15, 1992
STANDARD TEST METHODS FOR PERFORMANCE OF PERMANENT METAL RAILING SYSTEMS AND RAILS FOR BUILDINGS
A description is not available for this item.
June 15, 1992
STANDARD TEST METHODS FOR PERFORMANCE OF PERMANENT METAL RAILING SYSTEMS AND RAILS FOR BUILDINGS
A description is not available for this item.
July 15, 1991
STANDARD TEST METHODS FOR PERFORMANCE OF PERMANENT METAL RAILING SYSTEMS AND RAILS FOR BUILDINGS
A description is not available for this item.
July 26, 1985
STANDARD TEST METHODS FOR PERFORMANCE OF PERMANENT METAL RAILING SYSTEMS AND RAILS FOR BUILDINGS (R 1990)
A description is not available for this item.
June 10, 1983
Standard Test Methods for PERFORMANCE OF PERMANENT METAL RAILING SYSTEMS AND RAILS FOR BUILDING
These test methods describe procedures to be followed in testing the performance of permanent metal railing systems (guard, stair, and ramp-rail systems) and rails (hand, wall, grab, and transfer...
E935
June 10, 1983
Standard Test Methods for PERFORMANCE OF PERMANENT METAL RAILING SYSTEMS AND RAILS FOR BUILDING
These test methods describe procedures to be followed in testing the performance of permanent metal railing systems (guard, stair, and ramp-rail systems) and rails (hand, wall, grab, and transfer...

References

Advertisement