Planning Considerations – Like for like replacement of large, heavy or unwieldy signals assets

active, Most Current
Organization: LUL
Publication Date: 1 April 2022
Status: active
Page Count: 6
scope:

This guidance applies to all London Underground (LU) Signalling teams.

Items covered by this guidance include trainstops, transformers, point equipment, replacement air main, etc.

This guidance also applies when a number of smaller items need to be transported for change out at the same time, or where the route to and from the point of origin and the worksite is complex or is known to pose specific hazards.

Purpose

The purpose of this guidance is to provide a consistency of approach and advise of issues that may require consideration when planning for the like for like replacement of large, heavy or unwieldy signals assets, either for pre-planned activities or emergency change-out.

Document History

G1705
April 1, 2022
Planning Considerations – Like for like replacement of large, heavy or unwieldy signals assets
This guidance applies to all London Underground (LU) Signalling teams. Items covered by this guidance include trainstops, transformers, point equipment, replacement air main, etc. This guidance...