ACI - PRC-364.8
Hydrodemolition for Concrete Removal in Unbonded Post-Tensioned Systems—TechNote
active, Most Current
| Organization: | ACI |
| Publication Date: | 1 July 2022 |
| Status: | active |
| Page Count: | 3 |
Document History
PRC-364.8
July 1, 2022
Hydrodemolition for Concrete Removal in Unbonded Post-Tensioned Systems—TechNote
A description is not available for this item.
May 1, 2002
Use of Hydrodemolition for Concrete Removal in Unbonded Post-Tensioned Systems
Summary
During concrete removal around reinforcement, including unbonded post-tensioned systems, potential collateral damage to the repaired structure must be considered relative to future...