UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

SSPC - GUIDE 18

Specifier’s Guide for Determining Containment Class and Environmental Monitoring Strategies for Lead Paint Removal Projects

active, Most Current
Organization: SSPC
Publication Date: 1 February 2008
Status: active
Page Count: 16
scope:

This Guide describes a six-step process to assist in determining the type of containment system and the level of environmental monitoring that should be specified on a project-specific basis when removing coatings that contain lead. The selection of the containment and monitoring strategies is based on an assessment of the type of paint removal method that will be used and the potential impact of the operations on the public, other workers in the area, and the environment. Note that local and state codes and regulations must be reviewed and take precedence to any guidance provided in this document.

The guidance provided in this document also applies to coatings containing other hazardous metals such as cadmium and chromium; however, the recommended analytical monitoring is often based on an analysis for lead. Paint chip sampling and testing for lead and other hazardous metals should be undertaken to properly characterize the paint being removed.

This Guide does not cover the selection of paint removal methods, or design of containment/ventilation systems.

Document History

February 1, 2008
Specifier's Guide for Determining Containment Class and Environmental Monitoring Strategies for Lead-Paint Removal Projects
This guide describes a six-step process to assist in determining the type of containment system and the level of environmental monitoring that should be specified on a projectspecific basis when...
GUIDE 18
February 1, 2008
Specifier’s Guide for Determining Containment Class and Environmental Monitoring Strategies for Lead Paint Removal Projects
This Guide describes a six-step process to assist in determining the type of containment system and the level of environmental monitoring that should be specified on a project-specific basis when...
February 1, 2008
Specifier's Guide for Determining Containment Class and Environmental Monitoring Strategies for Lead-Paint Removal Projects
This guide describes a six-step process to assist in determining the type of containment system and the level of environmental monitoring that should be specified on a projectspecific basis when...

References

Advertisement