NR/L3/ELP/27720/04 ISSUE 1
Test Before Touch for Overhead Line Equipment: Method 4: A Test Before Touch Action Prior to Every Occasion Where It Is Planned to Touch a Conductor
active, Most Current
| Organization: | NR |
| Publication Date: | 3 September 2022 |
| Status: | active |
| Page Count: | 5 |
scope:
This module details the requirements to implement a Test Before Touch action prior to every occasion where it is planned to touch a conductor.
Document History
NR/L3/ELP/27720/04 ISSUE 1
September 3, 2022
Test Before Touch for Overhead Line Equipment: Method 4: A Test Before Touch Action Prior to Every Occasion Where It Is Planned to Touch a Conductor
This module details the requirements to implement a Test Before Touch action prior to every occasion where it is planned to touch a conductor.