TTMA - TB 122
Operation of Typical Vapor Recovery Lines on 400-Series Cargo Tanks
active, Most Current
| Organization: | TTMA |
| Publication Date: | 1 April 2017 |
| Status: | active |
scope:
This T.B. is intended to instruct personnel how to operate typical vapor recovery lines on DOT 407 and DOT 412 cargo tanks. These lines conform with TTMA R.P. No. 102.
Document History
TB 122
April 1, 2017
Operation of Typical Vapor Recovery Lines on 400-Series Cargo Tanks
This T.B. is intended to instruct personnel how to operate typical vapor recovery lines on DOT 407 and DOT 412 cargo tanks. These lines conform with TTMA R.P. No. 102.
April 23, 2010
Operation of Typical Vapor Recovery (VRL) Lines on DOT 407 and DOT 412 Cargo Tanks
A description is not available for this item.
April 16, 2004
Operation of Typical Vapor Recovery (VIU) Lines on DOT 407 and DOT 412 Cargo Tanks
A description is not available for this item.